Showing posts with label public works. Show all posts
Showing posts with label public works. Show all posts

Monday, September 26, 2011

Will American Industry Step Up?

Lately, the President has brought forth a new effort to get people working again.  One of the more local public works jobs, which would really create jobs, is the rebuilding of the Brent Spence Bridge from Northern Kentucky to Cincinnati, Ohio.  Now, all we have to do is sell this idea to Congress.

Back in the day, Congressmen used to have "knock down - drag out" battles over which one would get a job creating (pork barrel) project like this.  Many of the projects were just to get jobs and not do anything else, but this will replace an aging structure which carries roughly twice the traffic it was designed to carry.  This is a real economic development project which will impact the entire region. Not only does this bridge connect Cincinnati with its southern half of the metro area, it holds Interstate 75 and Interstate 71.  I -75 is one of the most heavily traveled Interstates in the eastern half of the country.

The Brent Spence Bridge carries traffic flowing from Detroit to Miami, from Chicago to Atlanta and from New Orleans to Cleveland/Pittsburgh. That could easily be one fifth of all highway freight traffic in the eastern U.S.  Existing rail infrastructure will not allow the railroads to pick up the slack and the Ohio and Mississippi rivers are limited in just how far they can reach and the aging lock system.

Other Interstate bridges are beginning to show similar wear and tear, as evidenced by the Sherman Minton Bridge of I-64, from Louisville to Southern Indiana.

Why, in a time of high unemployment, should two of the most powerful members of Congress, Mitch McConnell and John Boehner, who just happen the represent the states on either side of this important highway link feel that pushing this project forward is wrong.  Is it because this is a public works project expected to cost billions?  Would it be due to the timing being under a Democratic president?  Both Brent Spence and Sherman Minton were Democratic Congressmen, so the Republicans cannot assist in their repair/replacement?

Maybe these types of construction projects should be funded by the folks who use them the most. Maybe time has come when we the American taxpayer should let the American consumer pay for Interstate repairs.  Have any of our American corporations (the ones sitting on well over $2 trillion in cash) come forward to pay for the infrastructure which allows their businesses to thrive?  The trucking industry and independent truckers pay hefty fuel taxes and usage fees in order to keep the goods rolling and private autos pay their fair share of gas taxes, yet the Federal Highway Trust Fund is still shrinking to the point that it cannot pay for all necessary repairs.  Clearly, there needs to be a better way.

As Rob Morris pointed out the other day in his new blog CivilMechanics,  jobs are created when there is a demand for goods or services.  He is dead on in his assessment this time.  The Interstate bridges are in disrepair, so there is a need.  Construction jobs are becoming very hard to come by, so there is a need.  Government funds will only add to the mounting deficit, so there is a need (to not add more debt).  People on both sides of the river still have to get to the jobs that they still have, so the need is there.

The needs are many and the funds are few, so when will American industry step up to the plate?

Monday, October 25, 2010

I Stand Corrected

I made a mistake in last nights post. I took Mr Gray at his word and used his math for the cost of the S. Limestone project. I should not have done that.

According to the morning Herald-Leader that claim is FALSE. It did not cost $7,000 a foot, it was more like $5,000. It also was priced for far more than paving as I said last night.

This was a project that had its beginnings in the Town-Gown meetings between the University and the City. If I recall correctly, the Vice Mayor was initially part of that committee and may have kept attending through their recommendations. The Downtown Development Authority also included it in their Downtown Master Plan, which Mr. Gray served on is some capacity. It is also unclear whether he was still attending when the final plan was passed.

One thing that is not unclear is the vote that Mr. Gray cast to NOT decrease the budgeted amount. With the economy in decline and some certainty as to funding from Stimulus money( not like the CentrePointe deal) or other Federal money, Gray and the rest of the Council went along in approving this street rebuilding. It WAS much more than your normal, seasonal repaving.

From the comments that I have read about the project, I believe that some property owners and businessmen looked at this as "just another pie-in-the-sky, city plan" and, if it gets underway, it will be like the house-flipping shows on TV. This was an "extreme makeover", not just putting lipstick on a pig.

The contractor also won the job, not on the lowest bid but on the best bid. The only other bidder could not make the original finish date, ATS not only completed on time, but under budget despite the unforeseen extras found while excavating Lexington's history.

I can only hope that the Herald-Leader has better things to say when the S. Lime/S. Upper/Scott St intersection is rebuilt in the next few years.

Thursday, January 22, 2009

Mayor's Stimulus Package

Today, I want to take a break from the Destination 2040 visioning comments and think about the Mayor’s $556 million stimulus package wish list.

This list contains some interesting and somewhat confusing items, but I think that all of them are needed at some level.

All of the Airport projects are well documented but yet may be less needed if the airline industry declines further or the tourism industry continues to falter.
  • Carrier Ramp Rehabilitation 2,618,000
  • Terminal Drive and Airfield Lighting Electrical Vault 5,930,000
  • TW D Relocation and Corp. Ramp Addition ? Phase II 7,033,000
  • Construct RW 9-27 Phases II and III 18,000,000
There are a number of projects that puzzle me concerning the Government Center Buildings. Primarily the main Government Center, the Switow building , the Phoenix building and the Old Court House(now the History Museum). The Mayor and the Council have made a big deal about the need for a new City Hall Complex and have had a consultant study the same. The recommendation has been given that, yes, we do need a new building but a location has not been identified. The Mayor an Council have proposed replacing the Stewart’s garage and Police headquarters with a new City Hall and removing the Phoenix building and parking garage. With that as background, we find on the wish list these items:
  • Switow Building; Painting/Flooring and HVAC Improvements 170,000
  • Phoenix Building; Windows/Flooring/Painting and HVAC Improvements 2,020,000
  • Government Center; Total Building Renovations 8,000,000
  • Coroner's Office; Total Building Renovations including HVAC 1,500,000
  • Government Center Parking Garage Restoration. Safety, ADA, and structural improvements to important downtown public parking garage. 2,181,000
  • Annex Parking Garage; Concrete Repairs 100,000
  • Courthouse Parking Garage; Upgrade Revenue Producing Equipment 100,000

Each of these would be vacated and/or demolished in the near future if a new city hall is built, so is the administration covering its bases or wasting money?

A great deal of discussion has been held in many forums, about the CentrePointe TIF. Several public projects have been identified for the use of the TIF funds in the area surrounding the new hotel/condo tower, not the least of which is the old Court House renovation. So, where did this come from?
  • Fayette County Courthouse; Major Renovation/HVAC 23,000,000
If the old Court House is done with stimulus money for what do we use the TIF money? Does this put the TIF status in jeopardy? Can we be double dipping?

The Distillery District is also in the pipeline for TIF status and it too has a stimulus entry.
  • Distillery District public improvements to include new sidewalks, Town Branch Trail, placement of utility lines underground, storm drainage improvements, and new sanitary lines 15,000,000
And how about the following, can they not be combined into one project?
  • Upgrade of Roofing (insulation)and HVAC systems of Bell Place 200,000
  • Renovate historic Carriage House Theater at Bell House, a 150 year old historic landmark in Lexington 250,00
  • Bell House replacement windows on signature public space in Lexington. Project will reduce fuel costs, water incursion and deterioration to 150 year old National Historic Register property 150,000
The only skatepark in Lexington is in Woodland Park which is also the site of Realtor’s Plaza. There is also a set of tennis courts sandwiched in between.
  • Renovate outdated shelter/restroom building that houses Therapeutic Recreation and swim camp programs and skateboard/concession functions with energy and security efficient structure 150,000
  • Redevelopment of Realtor's Plaza 130,000
Once again these could be combined in to one project.

There are several signalized intersections listed to be rebuilt.
  • Rebuild Signalized Intersection, Cooper Drive at University Drive 200,000
  • Rebuild Signalized Intersection, Rosemont Garden at Southland Dr 200,000
  • Rebuild Signalized Intersection, Third Street at Race Street 200,000
  • Re-build Traffic signals in downtown 1,600,000
The last entry does not identify which signals or how many, but from the cost given, I would guess the number to be eight. That would not jive with the number of jobs created though. The first three add five jobs each, but the last one adds 15. Go figure.

This next ones really throws me. Somewhere there is a disconnect in these two entries.
  • develop centralized city-wide 4 field Football Complex with artificial turf to avoid 'home-away' conflicts and provide safer surface 3,000,000
  • Lafayette High School Football Stadium 6,500,000
Each of the 4 other public high schools has rebuilt their football stadiums in the past few years and each with artificial turf, I believe. Two of the private high schools have their own sports complexes. So, where can we find a “central location”, presumably, currently owned and construct 4 fields, for half the price of one, at its present location. Does anybody have any idea where this is proposed?

The Board of Education has a few items on the list, and well they should, and only a handful give rise to questioning.
  • Arlington Elementary School 13,206,275
  • Bryan Station Middle School 16,983,245
  • Cassidy Elementary School 13,827,791
  • Leestown Middle School 18,227,636
  • Russell Cave Elementary School 6,905,067
I know that the plans for Cassidy are ready to go and Bryan Station Middle are close, but I thought that Arlington was already underway. The students who attend there are in the old Johnson School site this year so that work could progress. If this item were to be approved, would they just reimburse the Board for some other project? Are a majority of the others currently bonded/ funded?

I know that to some this may sound nit-picky, but if Cheapside as a street, has been closed permanently, then would this item be a streetscape or a part of the old Court House renovation?
  • Streetscape Improvements - Cheapside Park 2,000,000
Transit has been a large part of the Obama campaign during the election, so it has a number of requests. Also, the City has awarded the development rights above the Transit Center to a national design/build firm who, I understand, wishes to acquire the current garage, demo it and build from the bottom up. To that end, how do we explain this:
  • Transit Center Parking Garage Restoration. Safety, ADA, and structural improvements to important downtown public parking garage. 1,026,000
  • Transit Center Parking Garage; Upgrade Revenue Producing Equipment 300,000
  • Transit Center Parking Garage; New Lighting/HVAC Improvements 136,000
  • Construction of new transit center in downtown Lexington. 20,000,000
Once again, I don’t want anyone to think that I am against any of these projects. I want to see a stimulus to the local economy, but not in the worst way. I am sure that these projects were listed so as to be able to be done on a “stand alone” basis , if necessary and they were pulled together in a short time span. I just think that we can do better if we give the public some wiser planning.

Thursday, December 25, 2008

Lexington's Obama stimulus connection

On Tuesday, Business Lexington reported on a conference call between the Obama transition team and our local officials. The incoming administration is seeking to create an economic stimulus package, that nationwide, could reach nearly $800 billion for what are called "shovel ready" projects. Projects that could be completed in one or two years.

Lexington leaders have identified a number of the projects with an estimated cost of $455 million. These projects are ones that are already on the drawing board to repair or replace existing infrastructure that have not found a funding source. The designs are essentially done but there are no scheduled construction dates set.

Should the Obama administration achieve their package and award Lexington with funds, I would hope that we would not just solve the old problems with old solutions. The buzz words of Mayor Newberry's campaign were health care, high tech and horses and I cannot see how, in these brick and morter, shovel ready projects, that horses or health care could fit in. That just leaves the high tech aspect. Each of these projects needs to be re-evaluated for an application of a higher level of technology in their respective solutions before they actually request the funds be spent.

I would like to call on the Lexington leaders to apply the "high tech" litmus test to all new projects under consideration, not just to have whiz bang, bells and whistles as part of the show, but a real use of technology in the solution. I also don't want the city to rely just on technology in all of their dealings as I try to follow Scotty's comment "The more complicated you make the plumbing, the easier it is to stop up the drain". Technology should not be used just for technology's sake.